Trade supplier of HVAC zoning, controls and air distribution components across Australia
AUSTRA SUPPLY
Six-core motor cable, 15 m coil
Six-core motor cable, 15 m coilSix-core motor cable, plug close-up

Zoning and controls · Kits and cables

Six-core motor cable, 15 m

Part number: AS-CBL-6C-15M

A 15 metre six-core lead that joins each damper actuator to the zone controller. It carries low-voltage power and the control signal in one run, with RJ11 6P6C plugs at both ends.

Length15 m
Cores6
ConnectorsRJ11 6P6C, both ends
Part numbers on every size1 part listed below.
Project quantitiesQuoted to suit your order.

Overview

Each damper needs power and a control signal. This lead carries both in a single run, so you pull one cable per zone, not two.

It plugs in at both ends. Nothing is made off on site, so every core keeps its function and a suspect run can be swapped for a known-good lead in minutes.

The maximum run from controller to actuator is 20 metres. The 15 metre length reaches the far rooms of most homes with spare for routing and a service loop.

Typical applications

  • New zoning installs
  • Adding zones
  • Replacing damaged runs

Part numbers

Choose a quantity and add each part to your quote list. Prices are sent by written quote.

Part numberDescriptionSize (mm)MaterialUnitQuote
AS-CBL-6C-15MSix-core motor cable, 15 m15 mEach

Specifications

General

Length15 m
Cores6
ConnectorsRJ11 6P6C plug, both ends
Maximum run, controller to actuator20 m

Specifications may change without notice. Contact us to confirm details for your project.

Compatible products

Products that are often specified with the six-core motor cable, 15 m.

  • F03 motor kit

    Everything needed to motorise a zone, in one part number.

    AS-MK-F03
  • F03 damper actuator, angled view
    F03 damper actuator

    24 VAC damper actuator that holds any position. 3.9 N·m running torque, 1 RPM.

    AS-ACT-F03-24
  • 4-zone modulating controller, front panel with 25, 50, 75 and 100% settings for each zone
    4-zone modulating controller

    Four zones, each set to 25, 50, 75 or 100% open, with a spill zone.

    AS-ZC-4M

Frequently asked questions

Can I join two leads for a longer run?

Keep the total run from controller to actuator under 20 metres. Longer runs can drop the voltage below what the actuator needs.

Need pricing for a project?

Not sure which part you need? Send us the job or your schedule. We will work out the parts list and quote every line.